Nematron Pointe Controller Manuale Utente Pagina 102

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 101
Chapter 4: System Design and Installation Pointe Controller User Guide
100
The mounting process is exactly the same as described for mounting to a DIN rail.
Be sure that your orientation is right so the connectors on the base and the front
panel line up. An Pointe Controller unit base attached to an OptiLogic operator
panel should look like the figure below.
The short ribbon cable, which comes with the operator panel should be used to
provide the connection between the Pointe Controller base and the operator
panel.
Vedere la pagina 101
1 2 ... 97 98 99 100 101 102 103 104 105 106 107 ... 440 441

Commenti su questo manuale

Nessun commento